2)Checking Continuity of Fuse on PCB Ass’y
Remove PCB Ass’y from electrical component box.
Then pull out the fuse from PCB Ass’y (Fig. 5).
Check continuity of fuse by the multimeter (Fig. 6).
3)Checking Motor Capacitor
Remove the lead wiers from the capacitor
terminals, and then place a probe on the capacitor
terminals as shown in Fig. 7. Observe the
deflection of the pointer, setting the resistance
measuring range of the multimeter to the
maximum value.
The capacitor is “good” if the pointer bounces to a
great extent and then gradually returns to its
original position.
The range of deflection and deflection time deffer
according to capacity of the capacitor.